How to install a folding container house in 30 minutes?

How to install a folding container house in 30 minutes?

Summary

Foldable container house can be used for medical disaster relief, military barracks, postearthquake resettlement,highways,railways, buildings, wind power,optoelectronics, oil exploration,emergency response of dangerous buildings,etc.Quick and convenient disassembly and assembly, noneed for professional construction teams,shortening disassembly and assembly time, no damage for secondary utilization,saving transportation and disassembly costs, low-carbon, green, and environmentally friendly.

How to install a folding container house in 30 minutes?

How to install a folding container house in 30 minutes?

Traditionally, it takes about three to five months to build a brick-concrete house. A foldable container prefab house, famous in the temporary construction industry, can be installed in 30 minutes. It only needs two people to operate, which is convenient and fast. It can be used as a building. Railways, highways and other temporary housing can also be used as fixed buildings, such as cafes, apartments, hotels, etc. But how to install a folding container house in 30 minutes? Let's take a look at it.

Step 1:


Check the stability of the steel wire rope. Hoist the mainframe. Place a support rod in the middle of the box to keep it stable after smooth deployment.
The main body of the folding box room is hung up.
Place a support rod in the middle of the folding box to keep it stable

Step 2:

Push one wall panel away, tighten it with fastening screws, push the other wall with doors and windows open, and secure the screws.

Step 3:

Lift the folding box room to the predetermined installation position, and put it down after ensuring no one is around.
The folding box room is hoisted to the predetermined position.
From the above installation steps of the foldable container prefab, we can see that it only takes about 30 minutes to complete the installation of a folding container room under the operation of professional installers. During the installation process, non-professionals should remember not to stand under the folding box room or crane to avoid safety accidents.

Note:

When the foldable container prefab is installed, non-workers should stay away from the installation area to avoid danger.